Items where Subject is "Teknik Sipil > Penyelesaian detail dalam Bangunan"

Up a level
Export as [feed] Atom [feed] RSS 1.0 [feed] RSS 2.0
Group by: Creators | Item Type
Jump to: A | O | R
Number of items at this level: 4.

A

AKMA REZA, NIM. 112015111 (2019) ANALISA MANAJEMEN WAKTU DAN BIAYA PADA PROYEK PENGENDALIAN BANJIR SUNGAI AIR HITAM DI KECAMATAN TULUNG SELAPAN METODE TIME COST TRADE OFF. Skripsi thesis, Universitas Muhammadiyah Palembang.

O

OKTA SELLA FEBRIANA, NIM. 112015074 (2019) TINJAUAN KELAYAKAN INVESTASI ALAT BERAT BERDASARKAN PERKIRAAN LAMANYA WAKTU SEWA PERTAHUN. Skripsi thesis, Universitas Muhammadiyah Palembang.

ONKY PRANANDA, 112015054 (2019) ANALISA KEBUTUHAN AIR BERSIH UNTUK OPERASIONAL GEDUNG STUDENT RESIDENCE UIN RADEN FATAH PAEMBANG. Skripsi thesis, UNIVERSITAS MUHAMMADIYAH PALEMBANG.

R

RIAN HIDAYAT, 112012157 (2019) ANALISA EFEKTIFITAS PENERAPAN PERENCANAAN MANAJEMEN PROYEK PADA PELAKSANAAN PROYEK PEMBANGUNAN GEDUNG PABRIK NPK FUSION II KAPASITAS 2 × 100.000 MTPY PT. PUPUK SRIWIDJAJA PALEMBANG. Skripsi thesis, Universitas Muhammadiyah Palembang.

This list was generated on Thu Oct 17 18:21:39 2019 WIB.

is powered by EPrints 3 which is developed by the School of Electronics and Computer Science at the University of Southampton. More information and software credits.