ANALISA NILAI HASIL TERHADAP WAKTU DAN BIAYA PADA PROYEK PEMBANGUNAN JEMBATAN PATIH GALUNG DI KOTA PRABUMULIH

Rajulian Nurkholis Arravi, NIM : 112018174 (2022) ANALISA NILAI HASIL TERHADAP WAKTU DAN BIAYA PADA PROYEK PEMBANGUNAN JEMBATAN PATIH GALUNG DI KOTA PRABUMULIH. Skripsi thesis, Universitas Muhammadiyah Palembang.

[img]
Preview
Text
112018174_BAB I - DAFTAR PUSTAKA.pdf

Download (535kB) | Preview
[img] Text
112018174_BAB II.pdf
Restricted to Repository staff only

Download (257kB)
[img] Text
112018174_BAB III.pdf
Restricted to Repository staff only

Download (3MB)
[img] Text
112018174_BAB IV.pdf
Restricted to Repository staff only

Download (904kB)
[img] Text
112018174_BAB V.pdf
Restricted to Repository staff only

Download (7kB)
[img] Text
112018174_DAFTAR PUSTAKA.pdf
Restricted to Repository staff only

Download (8kB)
[img] Text
112018174_LAMPIRAN.pdf
Restricted to Repository staff only

Download (5MB)
[img] Text
112018174_FULL TEXT.pdf
Restricted to Repository staff only

Download (9MB)

Abstract

The complexity of problems during the implementation of work leads to a lot of completed work not according to the planned one. Neither on time, quality and cost which sometimes occurs overbugdet. To overcome this, it is necessary to have good cost, quality and time management. Construction work can be managed properly and easily, one of which is by using the Value Of Results Method. The purpose of this study is to estimate the time and cost at the end of the project in terms of cost how it will affect if it occurs. The research method is how to analyze the value of the results on project performance in terms of time and cost and the estimated time of completion of the project using the Earned Value Analysis method. From the application of the results value examined within a period of 45 weeks, it shows that the completion of the project if reviewed in week 54 in terms of work time will experience an acceleration of work, namely for 74.4 weeks where the planned is for 76 weeks. Meanwhile, in terms of work costs, it was not as planned, which was Rp. 80,696,388,000. The final total project cost was Rp. 82,048,831,530. The difference between the total cost of work and plan cost is -Rp.1,352,443,530 which means that the project suffers a loss.

Item Type: Thesis (Skripsi)
Additional Information: Pembimbing : 1. Ir.R.A Sri Martini, M.T. 2. Ir. Revisdah, M.T.
Uncontrolled Keywords: Keywords: Cost Management, Quality, and Time.
Subjects: Teknik Sipil > Penyelesaian detail dalam Bangunan
Divisions: Fakultas Teknik > Teknik Sipil (S1)
Depositing User: Mahasiswa Fakultas Teknik
Date Deposited: 19 Sep 2022 05:09
Last Modified: 19 Sep 2022 05:09
URI: http://repository.um-palembang.ac.id/id/eprint/22422

Actions (login required)

View Item View Item

is powered by EPrints 3 which is developed by the School of Electronics and Computer Science at the University of Southampton. More information and software credits.