ANALISA EFEKTIFITAS PENERAPAN PERENCANAAN MANAJEMEN PROYEK PADA PELAKSANAAN PROYEK PEMBANGUNAN GEDUNG PABRIK NPK FUSION II KAPASITAS 2 × 100.000 MTPY PT. PUPUK SRIWIDJAJA PALEMBANG

Aiko Putjawapa, 112012160 and Ria Aprika, 112014254 (2019) ANALISA EFEKTIFITAS PENERAPAN PERENCANAAN MANAJEMEN PROYEK PADA PELAKSANAAN PROYEK PEMBANGUNAN GEDUNG PABRIK NPK FUSION II KAPASITAS 2 × 100.000 MTPY PT. PUPUK SRIWIDJAJA PALEMBANG. Skripsi thesis, Universitas Muhammadiyah Palembang.

WarningThere is a more recent version of this item available.
[img] Text
112012157_BAB I_DAFTAR PUSTAKA.pdf
Restricted to Repository staff only

Download (1MB)
[img]
Preview
Text
112012157_BAB II_SAMPAI_BAB TERAKHIR.pdf

Download (664kB) | Preview

Abstract

Project management is very important in field working. Project management is used to minimilize unsuccessful risk to the project. Therefore, the implementation of the project must be same as the plan before. By analyzing the effectiveness of application of project management concept, it is hoped that it can know the comparison between plan and realization to the Erection Steel Structure Building Area Product Storage Building Construction Project Factory NPK Fusion II Capacity 2 × 100.000 MTPY PT. Pupuk Sriwidjaja Palembang. The method used in the research was taking curve data S,RAB, backing up the data, weekly report, and monthly report. Based on the analysis that the comparison or deviation between the plan and realization of the Erection Steel Structure Building Area Product Storage planned to begin 18 December 2018 to 24 February 2019 (69 day) which actually has a weight of 100%, but the results of the analysis show on the date 24 February 2019 only achieved weight 12,8415% or -87,1585 of the planned weights.

Item Type: Thesis (Skripsi)
Additional Information: 1. Ir. Revisdah, MT 2. Ir. Hj. RA. Sri Martini, MT
Uncontrolled Keywords: Time Management, Project Management
Subjects: Teknik Sipil > Penyelesaian detail dalam Bangunan
Divisions: Fakultas Teknik > Teknik Sipil (S1)
Depositing User: Mahasiswa Fakultas Teknik
Date Deposited: 20 Sep 2019 03:20
Last Modified: 20 Sep 2019 03:20
URI: http://repository.um-palembang.ac.id/id/eprint/5254

Available Versions of this Item

Actions (login required)

View Item View Item

is powered by EPrints 3 which is developed by the School of Electronics and Computer Science at the University of Southampton. More information and software credits.