ANALISA PENERAPAN SISTEM MANAJEMEN KESEHATAN DAN KESELAMATAN KERJA (SMK3) PADA GEDUNG MAPOLDA SUMATERA SELATAN

MUSTAQIM ALFALAH AKBAR, NIM 112016164 (2021) ANALISA PENERAPAN SISTEM MANAJEMEN KESEHATAN DAN KESELAMATAN KERJA (SMK3) PADA GEDUNG MAPOLDA SUMATERA SELATAN. Skripsi thesis, Universitas Muhammadiya Palembang.

[img]
Preview
Text
112016164_BAB I_DAFTAR PUSTAKA.pdf

Download (1MB) | Preview
[img] Text
112016164_BAB II_SAMPAI_BAB TERAKHIR.pdf
Restricted to Repository staff only

Download (1MB)

Abstract

ABSTRACT The Palembang Police Headquarters Building Project is one of the building constructions, with a building area of 1895,7 m2 consisting of 8 floors and has an organizational structure for occupational safety and health (K3), the Police Headquarters building on Jalan Jenderal Sudirman KM 3,5 Palembang. This project is a series of development activities for a construction that is unique with quality and within a certain period of time that has been planned with all the resources that include human. By applying occupational safety and health control technology, it is hoped that the workforce will achieve physical endurance, work power, and a high level of health. In addition, occupational safety and health can be desired to create high work comfort and safety. So, the elements in occupational safety and health are not limited to physical aspects, but also mental, emotional and psychological aspects. Based on the results of the analysis and discussion that has been carried out, it is obtained that from the 6 items we can add up those who wear PPE as much as 66 and those who do not wear 3, from these results we add up again 63+3=66 to % 63÷66x100= 95.45% and 3 66x100= 4.54%. % wearing helmet 11÷11x100=100%, shoes 11÷11x100=100%, gloves 11÷11x100=100%, Vest 8÷11x100=72.72%, hearing protection 11÷11=100%, welding goggles 11÷11x100=100% The following are the reasons why workers who do not wear PPE: do not wear a vest because of the heat.. Keyword: MAPOLDA Office Palembang, South Sumatra, Implementation of Occupational Health and Safety Management System (SMK3) Analysis

Item Type: Thesis (Skripsi)
Additional Information: Pembimbing:1.Ir.A Junaidi,M.T 2.Ir.Hj Nurnilam Oemiati,M.T
Uncontrolled Keywords: Keyword: MAPOLDA Office Palembang, South Sumatra, Implementation of Occupational Health and Safety Management System (SMK3) Analysis
Subjects: Teknik Sipil > Penyelesaian detail dalam Bangunan
Divisions: Fakultas Teknik > Teknik Sipil (S1)
Depositing User: Fakultas Teknik
Date Deposited: 07 Sep 2021 02:17
Last Modified: 07 Sep 2021 02:17
URI: http://repository.um-palembang.ac.id/id/eprint/17433

Actions (login required)

View Item View Item

is powered by EPrints 3 which is developed by the School of Electronics and Computer Science at the University of Southampton. More information and software credits.