RIAN HIDAYAT, 112012157 (2019) ANALISA EFEKTIFITAS PENERAPAN PERENCANAAN MANAJEMEN PROYEK PADA PELAKSANAAN PROYEK PEMBANGUNAN GEDUNG PABRIK NPK FUSION II KAPASITAS 2 × 100.000 MTPY PT. PUPUK SRIWIDJAJA PALEMBANG. Skripsi thesis, Universitas Muhammadiyah Palembang.
This is the latest version of this item.
Text
112012157_BAB I_DAFTAR PUSTAKA.pdf Restricted to Repository staff only Download (1MB) |
||
|
Text
112012157_BAB II_SAMPAI_BAB TERAKHIR.pdf Download (664kB) | Preview |
Abstract
Project management is very important in field working. Project management is used to minimilize unsuccessful risk to the project. Therefore, the implementation of the project must be same as the plan before. By analyzing the effectiveness of application of project management concept, it is hoped that it can know the comparison between plan and realization to the Erection Steel Structure Building Area Product Storage Building Construction Project Factory NPK Fusion II Capacity 2 × 100.000 MTPY PT. Pupuk Sriwidjaja Palembang. The method used in the research was taking curve data S,RAB, backing up the data, weekly report, and monthly report. Based on the analysis that the comparison or deviation between the plan and realization of the Erection Steel Structure Building Area Product Storage planned to begin 18 December 2018 to 24 February 2019 (69 day) which actually has a weight of 100%, but the results of the analysis show on the date 24 February 2019 only achieved weight 12,8415% or -87,1585% of the planned weights.
Item Type: | Thesis (Skripsi) |
---|---|
Additional Information: | 1. Ir. Revisdah, MT 2. Ir. Hj. RA. Sri Martini, MT |
Uncontrolled Keywords: | Time Management, Project Management |
Subjects: | Teknik Sipil > Penyelesaian detail dalam Bangunan |
Divisions: | Fakultas Teknik > Teknik Sipil (S1) |
Depositing User: | Mahasiswa Fakultas Teknik |
Date Deposited: | 21 Sep 2019 03:06 |
Last Modified: | 21 Sep 2019 03:06 |
URI: | http://repository.um-palembang.ac.id/id/eprint/5291 |
Available Versions of this Item
-
ANALISA EFEKTIFITAS PENERAPAN PERENCANAAN MANAJEMEN PROYEK PADA PELAKSANAAN PROYEK PEMBANGUNAN GEDUNG PABRIK NPK FUSION II KAPASITAS 2 × 100.000 MTPY PT. PUPUK SRIWIDJAJA PALEMBANG. (deposited 20 Sep 2019 03:20)
- ANALISA EFEKTIFITAS PENERAPAN PERENCANAAN MANAJEMEN PROYEK PADA PELAKSANAAN PROYEK PEMBANGUNAN GEDUNG PABRIK NPK FUSION II KAPASITAS 2 × 100.000 MTPY PT. PUPUK SRIWIDJAJA PALEMBANG. (deposited 21 Sep 2019 03:06) [Currently Displayed]
Actions (login required)
View Item |