RYAN HIDAYAT, NIM. 112014026 (2019) ANALISA PENERAPAN SISTEM MANAJEMEN KESELAMATAN DAN KESEHATAN KERJA (SMK3) PADA PROYEK PEMBANGUNAN HOTEL HARPER PALEMBANG. Skripsi thesis, Universitas Muhammadiyah Palembang.
|
Text
11 2014 026_BAB 1_DAFTAR PUSTAKA.pdf Download (1MB) | Preview |
|
Text
11 2014 026_BAB II_SAMPAI_BAB TERAKHIR.pdf Restricted to Repository staff only Download (1MB) |
Abstract
Abstract Hidayat, Ryan. 2019. Analysis of Application of Occupational Safety and Health Management System (SMK3) at the Palembang Harper Hotel Development Project. Skiing. Civil Study Program, Bachelor Program (S1). Faculty of Engineering. Muhammadiyah University of Palembang. Advisor (1) Ir. Noto Royan, M.T. (II) Ir. A. Junaidi, M.T. Keywords: Palembang Harper Hotel, SMK3, SOP, SPSS Construction project at PT. Waringin Megah in the construction of a harper hotel is one of the construction projects that has a high risk of workplace accidents. One of the reasons is the use of heavy equipment and sophisticated machines that require expertise to use them properly. Therefore, it is necessary to conduct research on the Implementation of Occupational Health and Safety Management System (SMK3) and analysis of the application of Standard Operating Procedure (SOP) so that work accidents can be reduced or pressed down to the minimum. In this study, the validity test will be carried out on a manual questionnaire as one of the calculation examples of how valid and invalid data is obtained as well as for the computational calculation with the Statistical Product and Service Solution (SPSS) program with the Bivariate Pearson method with the purpose so that data can be processed quickly and precisely. Based on the results of data processing that has been done for the assessment of the application of SMK3 on the Palembang-Indralaya toll road construction project based on PP RI No. 50 of 2012, the final score was 90.29% so that the application of SMK3 in the category was very good. Based on the results of the average research for the work SOP of erecting 81.53% including the good category, the average for the SOP for steel construction work scores 89.5% including very good, the average for the SOP for welding work scores 85.5% including very good, and the average for the SOP for the operation of the tower crane gets a score of 77.78% including good.
Item Type: | Thesis (Skripsi) |
---|---|
Additional Information: | pembimbing : 1. Ir. Noto Royan, MT 2. Ir. A. junaidi, MT |
Subjects: | Teknik Sipil > Teknik Struktural |
Divisions: | Fakultas Teknik > Teknik Sipil (S1) |
Depositing User: | Mahasiswa Fakultas Teknik |
Date Deposited: | 23 Mar 2019 04:17 |
Last Modified: | 23 Mar 2019 04:17 |
URI: | http://repository.um-palembang.ac.id/id/eprint/3816 |
Actions (login required)
View Item |