PERANCANGAN KEY PERFORMANCE INDICATORS (KPI) SEBAGAI DASAR PENGUKURAN KINERJA DI PROGRAM STUDI TEKNIK INDUSTRI MENGGUNAKAN METODE PERFORMANCE PRISM (Studi Kasus: Program Studi Teknik Industri Universitas Muhammadiyah Palembang)

WARIS TRI WARDOYO, NIM. 152014054 (2019) PERANCANGAN KEY PERFORMANCE INDICATORS (KPI) SEBAGAI DASAR PENGUKURAN KINERJA DI PROGRAM STUDI TEKNIK INDUSTRI MENGGUNAKAN METODE PERFORMANCE PRISM (Studi Kasus: Program Studi Teknik Industri Universitas Muhammadiyah Palembang). Skripsi thesis, Universitas Muhammadiyah Palembang.

[img]
Preview
Text
152014054_BAB I_DAFTAR PUSTAKA.pdf

Download (1MB) | Preview
[img] Text
152014054_BAB II_SAMPAI_BAB TERAKHIR (1).pdf
Restricted to Repository staff only

Download (1MB)

Abstract

Abstract: In the industrial almost the entire company or organization is currently using Key Performance Indicators (KPI) as one way to measure the performance of the company. Department of Industrial Engineering seeks make improvements to improve the quality of education, besides that it is also necessary to measure the performance of an effort to improve performance in every aspect of the performance of the department. This study related to the performance assessment Department of Industrial Engineering, University of Muhammadiyah Palembang. Performance Prism method is an appropriate method to represent their needs. The purpose of this research is determine KPI (Key Performance Indicators) as part of performance measurement. Stakeholder satisfaction obtained from questionnaires and stakeholder contribution obtained by interview was used to identify objective of department which is then used to identify the strategies, processes, and capabilities. Key Performance Indicators (KPIs) Department of Industrial Engineering which has been formed from the processes and capabilities that have been identified are as many as 26 KPI. Based on the results of weighting some 10 KPI has the highest value which in turn could be used as the main priorities that need to be noticed. Keywords: Performance Measurement, Performance Prism, KPI

Item Type: Thesis (Skripsi)
Additional Information: Pembimbing; 1. Masayu Rosyidah S.T., M.T. 2. Deni Saputra S.T., M.Sc.
Uncontrolled Keywords: Performance Measurement, Performance Prism, KPI
Subjects: Manajemen > manajemen perusahaan kecil dan besar
Divisions: Fakultas Teknik > Teknik Industri (S1)
Depositing User: Mahasiswa Fakultas Teknik
Date Deposited: 06 Mar 2019 04:37
Last Modified: 06 Mar 2019 04:37
URI: http://repository.um-palembang.ac.id/id/eprint/3086

Actions (login required)

View Item View Item

is powered by EPrints 3 which is developed by the School of Electronics and Computer Science at the University of Southampton. More information and software credits.