AHMAD THEDDY SAPUTRA, NIM 112018019 (2024) ANALISA JENIS KERUSAKAN JALAN MENGGUNAKAN METODE PCI PADA JALAN SINAR TUNGKAL KECAMATAN BAYUNG LENCIR KABUPATEN MUSI BANYUASIN SEPANJANG STA 203+300 - 211+300. Skripsi thesis, Universitas Muhammadiyah Palembang.
|
Text
112018019_BAB I.pdf Download (268kB) | Preview |
|
|
Text
112018019_DAFTAR PUSTAKA.pdf Download (265kB) | Preview |
|
Text
112018019_BAB II.pdf Restricted to Repository staff only Download (2MB) |
||
Text
112018019_BAB III.pdf Restricted to Repository staff only Download (528kB) |
||
Text
1120180119_BAB IV.pdf Restricted to Repository staff only Download (2MB) |
||
Text
112018019_BAB V.pdf Restricted to Repository staff only Download (255kB) |
||
Text
112018019_Lampiran.pdf Restricted to Repository staff only Download (1MB) |
||
Text
112018019_Cover_Sampai_Lampiran (2).pdf Restricted to Repository staff only Download (5MB) |
Abstract
Road density that is not balanced with driving knowledge can cause accidents. But road accident are not only caused by drivers’ lack of driving knowledge, they are also caused by poor road conditions. This road damage includes cracking, distortion and disintegration. Road pavement is usually caused by repetition of traffic loads, along with increasing economic growth in regions, including the Musi Banyuasin district. One method that can be used to carry out evaluations is the Pavement condition index (PCI). PCI can be used to analyze types of road damage. The damage levels used in the PCI method are low severity level (L), medium severity level (M), and high severity level (H). Based on the research result, after analyzing calculations using the PCI (Pavement Index Condition) method, an average PCI (Pavement Index Condition) value was obtained which shows that the condition of the road pavement is in very poor condition. The roads that must be prioritized for treatment first are on the Jalan Raya Palembang-Jambi STA 204+200-204+300 section by carrying out HRM (Heavy Routine Maintenance) or routine maintenance carried out on road sections in heavily damaged condition.
Item Type: | Thesis (Skripsi) |
---|---|
Additional Information: | Pembimbing : 1. Ir. Noto Royan, S.T 2. Mira Setiawati, S.T,.M.T |
Uncontrolled Keywords: | Keywords : Asphalt, road pavement, road damage, road handling,pavement condition index (PCI) |
Subjects: | Teknik Sipil > teknik jembatan |
Divisions: | Fakultas Teknik > Teknik Sipil (S1) |
Depositing User: | Mahasiswa Fakultas Teknik |
Date Deposited: | 18 May 2024 07:46 |
Last Modified: | 18 May 2024 07:46 |
URI: | http://repository.um-palembang.ac.id/id/eprint/29338 |
Actions (login required)
View Item |