ANALISA PENERAPAN SISTEM MANAJEMEN KESELAMATAN DAN KESEHATAN KERJA (SMK3) PADA PROYEK PEMBANGUNAN RUMAH SAKIT PERMATA PALEMBANG

ADITYA KRISNA JAYA, NIM. 112016169 (2023) ANALISA PENERAPAN SISTEM MANAJEMEN KESELAMATAN DAN KESEHATAN KERJA (SMK3) PADA PROYEK PEMBANGUNAN RUMAH SAKIT PERMATA PALEMBANG. Skripsi thesis, Universitas Muhammadiyah Palembang.

[img]
Preview
Text
112016169_BAB I_DAFTAR PUSTAKA.pdf - Published Version

Download (1MB) | Preview
[img] Text
112016169_BAB II.pdf - Published Version
Restricted to Repository staff only

Download (1MB)
[img] Text
112016169_BAB III.pdf - Published Version
Restricted to Repository staff only

Download (593kB)
[img] Text
112016169_BAB IV.pdf - Published Version
Restricted to Repository staff only

Download (1MB)
[img] Text
112016169_BAB V.pdf - Published Version
Restricted to Repository staff only

Download (98kB)
[img] Text
112016169_DAFTAR PUSTAKA.pdf - Bibliography
Restricted to Repository staff only

Download (7kB)
[img] Text
112016169_Cover_sampai_Lampiran.pdf
Restricted to Repository staff only

Download (6MB)

Abstract

This research is entitled "Analysis of the Implementation of the Occupational Safety and Health Management System (SMK3) in the Permata Palembang Hospital Development Project." K3 (Occupational Health and Safety) "Occupational Health and Safety", abbreviated as OHS. This type of research is field research, the type of data used is qualitative data, qualitative research is more descriptive in nature. There are two sources of data used in this study, namely primary data sources and secondary data sources. The technique used is by conducting direct observation (observation), interviews and documentation. While the data analysis technique used is descriptive qualitative analysis. From the results of this study, a conclusion was drawn that the Analysis of the Application of the Occupational Safety and Health Management System (SMK3) in the Palembang Permata Hospital Development Project carried out by PT. National Eternal Light. First, based on the results of data processing that has been carried out for the assessment of the implementation of SMK3 in the Permata Palembang Hospital development project based on PP RI No.50 of 2012, a final score of 90.29% was obtained so that the implementation of SMK3 was included in the very good category. Second, the average score for the SOP for structural work is a score of 81.53, which means it is in the 75-84 range based on table 2.2, so it is considered good. Keywords : Building Construction, Occupational Health and Safety Management System (SMK3), Application

Item Type: Thesis (Skripsi)
Additional Information: 1. Ir. H. Jonizar, M.T. 2. M. Hijrah Agung Sarwandy, S.T.,M.T.
Uncontrolled Keywords: Konstruksi Gedung, Sistem Manajemen Keselamatan Dan Kesehatan Kerja (SMK3), Penerapan
Subjects: Teknik Sipil > Konstruksi dalam Bahan-bahan Khusus
Teknik Sipil > Teknik Struktural
Divisions: Fakultas Teknik > Teknik Sipil (S1)
Depositing User: Mahasiswa Fakultas Teknik
Date Deposited: 24 Feb 2024 01:13
Last Modified: 24 Feb 2024 01:13
URI: http://repository.um-palembang.ac.id/id/eprint/28309

Actions (login required)

View Item View Item

is powered by EPrints 3 which is developed by the School of Electronics and Computer Science at the University of Southampton. More information and software credits.