ADITYA KRISNA JAYA, NIM. 112016169 (2023) ANALISA PENERAPAN SISTEM MANAJEMEN KESELAMATAN DAN KESEHATAN KERJA (SMK3) PADA PROYEK PEMBANGUNAN RUMAH SAKIT PERMATA PALEMBANG. Skripsi thesis, Universitas Muhammadiyah Palembang.
|
Text
112016169_BAB I_DAFTAR PUSTAKA.pdf - Published Version Download (1MB) | Preview |
|
Text
112016169_BAB II.pdf - Published Version Restricted to Repository staff only Download (1MB) |
||
Text
112016169_BAB III.pdf - Published Version Restricted to Repository staff only Download (593kB) |
||
Text
112016169_BAB IV.pdf - Published Version Restricted to Repository staff only Download (1MB) |
||
Text
112016169_BAB V.pdf - Published Version Restricted to Repository staff only Download (98kB) |
||
Text
112016169_DAFTAR PUSTAKA.pdf - Bibliography Restricted to Repository staff only Download (7kB) |
||
Text
112016169_Cover_sampai_Lampiran.pdf Restricted to Repository staff only Download (6MB) |
Abstract
This research is entitled "Analysis of the Implementation of the Occupational Safety and Health Management System (SMK3) in the Permata Palembang Hospital Development Project." K3 (Occupational Health and Safety) "Occupational Health and Safety", abbreviated as OHS. This type of research is field research, the type of data used is qualitative data, qualitative research is more descriptive in nature. There are two sources of data used in this study, namely primary data sources and secondary data sources. The technique used is by conducting direct observation (observation), interviews and documentation. While the data analysis technique used is descriptive qualitative analysis. From the results of this study, a conclusion was drawn that the Analysis of the Application of the Occupational Safety and Health Management System (SMK3) in the Palembang Permata Hospital Development Project carried out by PT. National Eternal Light. First, based on the results of data processing that has been carried out for the assessment of the implementation of SMK3 in the Permata Palembang Hospital development project based on PP RI No.50 of 2012, a final score of 90.29% was obtained so that the implementation of SMK3 was included in the very good category. Second, the average score for the SOP for structural work is a score of 81.53, which means it is in the 75-84 range based on table 2.2, so it is considered good. Keywords : Building Construction, Occupational Health and Safety Management System (SMK3), Application
Item Type: | Thesis (Skripsi) |
---|---|
Additional Information: | 1. Ir. H. Jonizar, M.T. 2. M. Hijrah Agung Sarwandy, S.T.,M.T. |
Uncontrolled Keywords: | Konstruksi Gedung, Sistem Manajemen Keselamatan Dan Kesehatan Kerja (SMK3), Penerapan |
Subjects: | Teknik Sipil > Konstruksi dalam Bahan-bahan Khusus Teknik Sipil > Teknik Struktural |
Divisions: | Fakultas Teknik > Teknik Sipil (S1) |
Depositing User: | Mahasiswa Fakultas Teknik |
Date Deposited: | 24 Feb 2024 01:13 |
Last Modified: | 24 Feb 2024 01:13 |
URI: | http://repository.um-palembang.ac.id/id/eprint/28309 |
Actions (login required)
View Item |