MUHAMMAD ANDI UMAR, NIM.112019142 (2023) ANALISA PENGARUH U-TURN (PUTAR BALIK ARAH) PADA BUKAAN MEDIAN JALAN STUDI KASUS DI DEPAN SUKABANGUN II PALEMBANG. Skripsi thesis, UNIVERSITAS MUHAMMADIYAH PALEMBANG.
|
Text
112019142_BAB I_DAFTAR PUSTAKA.pdf - Published Version Download (17MB) | Preview |
|
Text
112019142_BAB II.pdf - Published Version Restricted to Repository staff only Download (544kB) |
||
Text
112019142_BAB III.pdf - Published Version Restricted to Repository staff only Download (367kB) |
||
Text
112019142_BAB IV.pdf - Published Version Restricted to Repository staff only Download (860kB) |
||
Text
112019142_BAB V.pdf - Published Version Restricted to Repository staff only Download (40kB) |
||
Text
112019142_DAFTAR PUSTAKA.pdf - Bibliography Restricted to Repository staff only Download (31kB) |
||
Text
112019142_COVER_SAMPAI_LAMPIRAN.pdf - Published Version Restricted to Repository staff only Download (20MB) |
Abstract
ABSTRACT The case study road section in front of Sukabangun II Palembang, is a type of two-way road using a median, and there are 3 lanes on each lane. The U-turn (turn around) of the case study in front of Sukabangun II Palembang often causes vehicle obstacles. because the average vehicle user who makes a U-turn at that location wants to enter Jalan Sukabangun II. Research data collection was carried out by means of field surveys. Data were taken for one week from 06:00 to 18:00 WIB. The method used in this study is to use Deductive, Quantitative, and Rationalistic methods with the Level of Service approach and traffic calculations using MKJI 1997, so as to get the level of road service, vehicle delays, and the destination of vehicles making U-turns. The results of this study showed that the volume of vehicles during rush hour occurred on Monday, namely 16:00-17:00 WIB with a total passing vehicle of 6658.2 pcu/hour for the direction of the Polda to km 9 while for the direction of km 9 to the Polda obtained on Wednesday at 16:00-17:00 WIB with a total passing vehicle of 5155 pcu/hour. From the results of the data above, between 2019 and 2023 there was an increase in traffic volume of 29.7%, with a degree of saturation of 1.29 and classified as category F. These roads cannot accommodate the very high volume of vehicles and on these roads many vehicles make U-turns with a very high intensity scale. Based on the results of this study, it was concluded to widen the road section at the location and shift the U-turn as far as 150 meters towards km 9, so that there is no accumulation of vehicles at that location. Keywords: U-Turn Sukabangun II Palembang, Transportation, traffic jams
Item Type: | Thesis (Skripsi) |
---|---|
Additional Information: | 1. Ir.Erny Agusri, M.T 2. M.Hijrah Agung Sarwandy, S.T.,M.T |
Uncontrolled Keywords: | Keywords: U-Turn Sukabangun II Palembang, Transportation, traffic jams |
Subjects: | Teknik Sipil > teknik jalan raya |
Divisions: | Fakultas Teknik > Teknik Sipil (S1) |
Depositing User: | Mahasiswa Fakultas Teknik |
Date Deposited: | 31 May 2023 01:18 |
Last Modified: | 31 May 2023 01:18 |
URI: | http://repository.um-palembang.ac.id/id/eprint/25573 |
Actions (login required)
View Item |