BAGUS WAHYUDI, NIM. 112018183 (2023) ANALISA PENATAAN LAHAN PARKIR DI RUMAH SAKIT AR ROYYAN KEC.INDRALAYA UTARA KAB.OGAN ILIR SUMATERA SELATAN. Skripsi thesis, Universitas Muhammadiyah Palembang.
|
Text
112018183_BAB I_DAFTAR PUSTAKA.pdf - Published Version Download (640kB) | Preview |
|
Text
112018183_BAB II.pdf - Published Version Restricted to Repository staff only Download (640kB) |
||
Text
112018183_BAB III.pdf - Published Version Restricted to Repository staff only Download (135kB) |
||
Text
112018183_BAB IV.pdf - Published Version Restricted to Repository staff only Download (1MB) |
||
Text
112018183_BAB V.pdf - Published Version Restricted to Repository staff only Download (108kB) |
||
Text
112018183_DAFTAR PUSTAKA.pdf - Published Version Restricted to Repository staff only Download (107kB) |
||
Text
112018183_LAMPIRAN.pdf - Published Version Restricted to Repository staff only Download (2MB) |
||
Text
112018183_COVER_SAMPAI_LAMPIRAN.pdf - Published Version Restricted to Repository staff only Download (4MB) |
Abstract
Parking facilities are a matter of considerable concern, especially when visiting places that are crowded with visitors, such as the Ar Royyan Hospital, Ogan.Ilir District, which has irregular parking facilities and quite a few park in their places. So that it causes vehicles to be disorderly and irregular in using parking facilities. And there are still many visitors who park improperly. The purpose of this research is to overcome so that vehicle parking is well organized.This research was conducted with the stages of analyzing the area of the parking area, the area of the parking plot and the number of vehicles.From the results of data processing, it can be concluded that the largest number of cars occurred on Tuesday with a total of 93 vehicles and on Monday with a total of 227 vehicles, with a parking pattern of 90⁰ for cars and 60⁰ for motorbikes. The availability of parking capacity for 54 cars and 65 motorcycles, resulting in a capacity shortage of 20 cars and 27 motorbikes which was concluded from the calculation of the largest accumulation Keywords: Parking facilities, vehicle volume, parking arrangements
Item Type: | Thesis (Skripsi) |
---|---|
Additional Information: | Pembimbing:1.Ir.Noto Royan,M.T 2.Ir.Revisdah,M.T |
Uncontrolled Keywords: | Keywords: Parking facilities, vehicle volume, parking arrangements |
Subjects: | Teknik Sipil > teknik jalan raya |
Divisions: | Fakultas Teknik > Teknik Sipil (S1) |
Depositing User: | Mahasiswa Fakultas Teknik |
Date Deposited: | 31 May 2023 01:36 |
Last Modified: | 31 May 2023 01:36 |
URI: | http://repository.um-palembang.ac.id/id/eprint/25557 |
Actions (login required)
View Item |