Modelling Pembebanan Pada Pembangkit Listrik Tenaga Akumulator 100Ah Loop Tertutup Dengan Kapasitas Daya Maksimum 600Watt

Jodi Setiawan, NRP. 132017101 (2021) Modelling Pembebanan Pada Pembangkit Listrik Tenaga Akumulator 100Ah Loop Tertutup Dengan Kapasitas Daya Maksimum 600Watt. Skripsi thesis, Universitas Muhammadiyah Palembang.

[img]
Preview
Text
132017101_BAB1_DAFTAR PUSTAKA.pdf

Download (854kB) | Preview
[img] Text
132017101_BAB II_SAMPAI_BAB TERAKHIR.pdf
Restricted to Repository staff only

Download (1MB)

Abstract

Electrical energy is a vital need in economic formation and social development, so that a renewable energy is needed, one of which is an accumulator power plant with a power of 100 Ah using a closed loop system with a maximum power capacity of 600 Watt. Where the application used is MATLAB programming and a mathematical model in the form of linear regression with two variables and the correlation coefficient with R2. the results of the research carried out obtained the mathematical model yi = 12.3928 - 0.0027 x1 + 0.0302 x2 then obtained x1 = 455 (load variable, Watt) and x2 = 18.69 (current variable, Ampere), then the voltage yi = 11,724 Volts. Keywords : Modeling, Closed Loop, Loading, MATLAB

Item Type: Thesis (Skripsi)
Additional Information: Pembimbing, 1. Dr.Ir Cekmas Cekdin, M.T. 2. Rika Noverianty, S.T., M.T.
Uncontrolled Keywords: Keywords : Modeling, Closed Loop, Loading, MATLAB
Subjects: Elektro > Pengujian dan Pengukuran Listrik
Divisions: Fakultas Teknik > Teknik Elektro (S1)
Depositing User: Fakultas Teknik
Date Deposited: 02 Sep 2021 04:03
Last Modified: 02 Sep 2021 04:16
URI: http://repository.um-palembang.ac.id/id/eprint/17170

Actions (login required)

View Item View Item

is powered by EPrints 3 which is developed by the School of Electronics and Computer Science at the University of Southampton. More information and software credits.