M.AZMI, 112016137 (2021) PENGENDALIAN WAKTU PELAKSANAAN PEKERJAAN PROYEK PRESERVASI REHABILITAS JALAN BETUNG-BATAS KOTA PALEMBANG MENGGUNAKAN MICROSOFT PROJECT. Skripsi thesis, UNIVERSITAS MUHAMMADIYAH PALEMBANG.
|
Text
112016137 BAB 1_DAFTAR PUSTAKA PDF.pdf Download (2MB) | Preview |
|
Text
11201637_ BAB 2_ SAMPAI BAB TERAKHIR.pdf Restricted to Repository staff only Download (2MB) |
Abstract
ABSTRACT Betung – boundary Palembang city street is the national road for Region I of South Sumatra Province that connects access between regions, making travel faster and supporting the smooth distribution of logistics for the people of South Sumatra, especially Palembang City residents. Betung – boundary Palembang city street Rehabilitation Preservation Project was implemented by PT. Wasco-DVR Kso with the type of work of 1 KM widening, 20.58 KM of rehabilitation, 34.28 KM of reconstruction, and the work value of Rp. 124,000,018,000. Project control is an important part of construction project management in preventing project delays. Control monitors whether the results of activities that have been carried out are following the standards outlined and to ensure effective and efficient use of resources (Izzah, 2017). The process of planning and consciously controlling the time spent on certain activities, especially to increase effectiveness, efficiency and productivity. Based on the results and discussion after rescheduling using Microsoft Project in the Betung - boundary Palembang City street rehabilitation preservation project in Palembang City, it can be seen that the duration of normal activities has only become 200 days from 368 days from the plan. Before rescheduling, there were 51 work items on the critical path. After rescheduling, there is only one job left on the critical path. The initial work took 295,552 hours and after rescheduling the project ran 206,090 hours. Keyword: Betung – Boundary Palembang City Street, Management Project, and Microsoft Project 2013
Item Type: | Thesis (Skripsi) |
---|---|
Additional Information: | Nama Pembimbing : 1. Ir.Erny Agusri, M.T. 2. Muhammad Arfan, S.T.,M.T. |
Uncontrolled Keywords: | Keyword: Betung – Boundary Palembang City Street, Management Project, and Microsoft Project 2013 |
Subjects: | Teknik Sipil > teknik jalan raya |
Divisions: | Fakultas Teknik > Teknik Sipil (S1) |
Depositing User: | Fakultas Teknik |
Date Deposited: | 14 Jun 2021 01:32 |
Last Modified: | 14 Jun 2021 01:32 |
URI: | http://repository.um-palembang.ac.id/id/eprint/16662 |
Actions (login required)
View Item |