ANALISA KERUSAKAN JALAN PADA RUAS JALAN CITIMALL PRABUMULIH JEMBATAN LAYANG SUNGAI KELEKAR STA 00+000-11+000 KOTA PRABUMULIH PROVINSI SUMATERA SELATAN

Febri Fitriyan Saputro, NIM. 112014235 (2020) ANALISA KERUSAKAN JALAN PADA RUAS JALAN CITIMALL PRABUMULIH JEMBATAN LAYANG SUNGAI KELEKAR STA 00+000-11+000 KOTA PRABUMULIH PROVINSI SUMATERA SELATAN. Skripsi thesis, Universitas Muhammadiyah Palembang.

[img]
Preview
Text
112014235_BAB 1_DAFTAR PUSTAKA.pdf

Download (1MB) | Preview
[img] Text
112014235_BAB II_SAMPAI_BAB TERAKHIR.pdf
Restricted to Repository staff only

Download (733kB)

Abstract

Prabumulih City is the third largest city in southern Sumatra with a population of ± 161,000 inhabitants with an area of 435.10 km². In this Prabumulih City, there is a national road, one of which is the link between regencies in South Sumatra. Based on the function of the road in the Citimall prabumulih section to the Layang Sungai Kelekar Bridge located in the area of Mount Ibul Prabumulih Timur. This road has a fairly high density and activity, which is centered at the junction of the Yogya monument. From the observations of researchers shows that there is some damage that varies on the road that interferes with the activity of road users. Based on these observations, the researcher took the problem used as a Final Project entitled "Analysis of Road Damage on Jalan Citimall Prabumulih - Layang Sungai Kelekar Layang Bridge STA 00 + 000-11 + 000 Prabumulih City, South Sumatra Province" This study was conducted as far as 11 Km. The purpose of this study was to determine the number of LHR, the thickness of the pavement to be compared with the results of the calculation, identify the cause of road damage and the type of damage and determine the percentage of damage, and the level of service on the Citimall Prabumulih road to the Layang Sungai Kelekar Bridge in Prabumulih City. Based on the analysis and discussion, damage occurs due to vehicle loads that exceed the vehicle capacity, drainage conditions are not good because almost all drainage has been covered by sediment and some do not have drainage so that rain water floods the water, and the sidewalk. The solution obtained from the results of the study is that before repairing the pavement, it must first improve and increase drainage conditions, and improve the pavement surface coating so that the maximum burden borne by the road can also increase. Keywords: Prabumulih City, Citimall Prabumulih Road to Layang Sungai Kelekar Bridge, Road Damage Analysis.

Item Type: Thesis (Skripsi)
Additional Information: Pembimbing, 1. Ir. Noto Royan, MT 2. Ir. Revisdah, MT
Uncontrolled Keywords: Prabumulih City, Citimall Prabumulih Road to Layang Sungai Kelekar Bridge, Road Damage Analysis.
Subjects: Teknik Sipil > teknik jalan raya
Divisions: Fakultas Teknik > Teknik Sipil (S1)
Depositing User: Mahasiswa Fakultas Teknik
Date Deposited: 08 Jun 2020 03:41
Last Modified: 08 Jun 2020 03:41
URI: http://repository.um-palembang.ac.id/id/eprint/7750

Actions (login required)

View Item View Item

is powered by EPrints 3 which is developed by the School of Electronics and Computer Science at the University of Southampton. More information and software credits.