ILHAM RONA KUSUMA, NIM. 112018221 (2025) EVALUASI SELISIH RENCANA ANGGARAN BIAYA (RAB) DENGAN RENCANA ANGGARAN PELAKSANAAN (RAP) PADA PROYEK PERUSAHAAN RUMAH SUBSIDI TIPE 36 UNTUK MENGHITUNG BESARAN KEUNTUNGAN PENGEMBANG. Skripsi thesis, Universitas Muhammadiyah Palembang.
![]() |
Text
112018221_BAB I_DAFTAR PUSTAKA.pdf - Published Version Restricted to Repository staff only Download (720kB) |
![]() |
Text
112018221_BAB II.pdf Restricted to Repository staff only Download (1MB) |
![]() |
Text
112018221_BAB III.pdf Restricted to Repository staff only Download (709kB) |
![]() |
Text
112018221_BAB V.pdf Restricted to Repository staff only Download (258kB) |
![]() |
Text
112018221_DAFTAR PUSTAKA.pdf Restricted to Repository staff only Download (261kB) |
![]() |
Text
112018221_BAB IV.pdf Restricted to Repository staff only Download (2MB) |
![]() |
Text
112018221_LAMPIRAN.pdf Restricted to Repository staff only Download (4MB) |
![]() |
Text
112018221_Cover_sampai_Lampiran.pdf Restricted to Repository staff only Download (9MB) |
Abstract
The subsidized housing development project is part of a government program aimed at providing affordable and decent housing for low-income communities. In its implementation, two essential budgeting documents are involved: the Rencana Anggaran Biaya (RAB), which follows government standards, and the Rencana Anggaran Pelaksanaan (RAP), which is prepared by the developer based on field execution strategies. The difference between RAB and RAP is a key indicator in determining the developer’s profit. This study aims to evaluate the difference between RAB and RAP in the construction of subsidized type-36 houses and to calculate the profit margin gained by the developer from that difference. The research applies a descriptive quantitative method by comparing RAB data based on government’s Unit Price Analysis (AHS) with RAP prepared by the developer. The analysis covers each construction component, including preparatory work, soil work, structure, architectural works, and installations. The evaluation reveals a significant discrepancy between total RAB and RAP values. This gap indicates cost efficiency achieved by the developer through more economical implementation strategies. The developer’s profit is calculated from the cost difference and expressed as a percentage of the total RAB. This research can serve as a reference for evaluating the efficiency of planning and executing subsidized housing projects in the future.
Item Type: | Thesis (Skripsi) |
---|---|
Additional Information: | 1. Ir. Revisdah, M.T 2. Dr. Verinazul Septriansyah, S.T, M.T |
Uncontrolled Keywords: | RAB, RAP, Subsidized Housing, Type 36, Developer Profit, Cost Evaluation |
Subjects: | Teknik Sipil > Bahan-bahan Bangunan |
Divisions: | Fakultas Teknik > Teknik Sipil (S1) |
Depositing User: | Mahasiswa Fakultas Teknik |
Date Deposited: | 06 Sep 2025 03:57 |
Last Modified: | 06 Sep 2025 03:57 |
URI: | http://repository.um-palembang.ac.id/id/eprint/32954 |
Actions (login required)
![]() |
View Item |