Muhamaddan Kallazi Arsalta Putra, NIM. 112021035 (2025) ANALISA PERHITUNGAN PRODUKTIVITAS PEKERJAAN PEMANCANG HSPD PADA PEMBANGUNAN JEMBATAN TRANS GAS INDONESIA AKSES TOL BAYUNG LENCIR – TEMPINO SEKSI 1. Skripsi thesis, Universitas Muhammadiyah Palembang.
|
Text
112021035_BAB I_DAFTAR PUSTAKA.pdf - Published Version Download (1MB) | Preview |
|
![]() |
Text
112021035_BAB II.pdf - Published Version Restricted to Repository staff only Download (629kB) |
|
![]() |
Text
112021035_BAB III.pdf - Published Version Restricted to Repository staff only Download (517kB) |
|
![]() |
Text
112021035_BAB IV.pdf - Published Version Restricted to Repository staff only Download (521kB) |
|
![]() |
Text
112021035_BAB V.pdf - Published Version Restricted to Repository staff only Download (160kB) |
|
![]() |
Text
112021035_DAFTAR PUSTAKA.pdf - Published Version Restricted to Repository staff only Download (171kB) |
|
![]() |
Text
112021035_LAMPIRAN.pdf - Published Version Restricted to Repository staff only Download (3MB) |
|
![]() |
Text
112021035_Cover_sampai_Lampiran.pdf - Published Version Restricted to Repository staff only Download (5MB) |
Abstract
Along with the development of urban areas, building and infrastructure construction projects also continue to increase, the use of human labor with conventional tools is no longer efficient. The use of technology is becoming increasingly common to help and simplify project management. Hydraulic static pile driver is one of the tools used in largescale construction projects. Choosing the right design tools for the work of a construction project can increase productivity. Increased productivity levels are strongly related to time spent, as a mixture of production capacity and activity. This research was carried out on the construction project of the Trans Gas Indonesia Bridge access to the Bayung Lencir-Tempino Toll Road section 1. The purpose of this study is to determine the productivity value of hydraulic static pile driver design work and to find out the factors that affect productivity in piling work. Based on the results of this study, the work of designing hydraulic static pile drivers at each piling point has varying values. The highest productivity occurred in the observation of pile 4-A with a productivity value of 20,462 m/h, while the lowest productivity occurred in the observation of pile 3-C with a productivity value of 9,295 m/h. And the results of factors that affect the productivity of hydraulic static pile driver designers' work with the highest are late start and early quits activities with a percentage of 29.70% and the lowest activity is refolding with a percentage of 6.40%.
Item Type: | Thesis (Skripsi) |
---|---|
Additional Information: | 1. Ir. Revisdah, M.T. 2. M. Hijrah Agung Sarwandy, S.T., M.T. |
Uncontrolled Keywords: | Productivity, Pile Driver, Hydraulic Static Pile Driver |
Subjects: | Teknik Sipil > teknik jembatan |
Divisions: | Fakultas Teknik > Teknik Sipil (S1) |
Depositing User: | Mahasiswa Fakultas Teknik |
Date Deposited: | 06 Sep 2025 04:07 |
Last Modified: | 06 Sep 2025 04:07 |
URI: | http://repository.um-palembang.ac.id/id/eprint/32952 |
Actions (login required)
![]() |
View Item |