M. AHSANI FAJRI, NIM 112020100 (2025) ANALISA KEBUTUHAN AIR BERSIH DI RUMAH SAKIT UMUM DAERAH KABUPATEN OGAN ILIR. Skripsi thesis, Universitas Muhammadiyah Palembang.
|
Text
112020100_BAB I_DAFTAR PUSTAKA.pdf Download (823kB) | Preview |
|
![]() |
Text
112020100_ BAB II.pdf Restricted to Repository staff only Download (593kB) |
|
![]() |
Text
112020100_BAB III.pdf Restricted to Repository staff only Download (438kB) |
|
![]() |
Text
112020100_BAB IV.pdf Restricted to Repository staff only Download (656kB) |
|
![]() |
Text
112020100_BAB V.pdf Restricted to Repository staff only Download (56kB) |
|
![]() |
Text
112020100_DAFTAR PUSTAKA.pdf Restricted to Repository staff only Download (40kB) |
|
![]() |
Text
112020100_LAMPIRAN.pdf Restricted to Repository staff only Download (2MB) |
|
![]() |
Text
112020100_cover_sampai_ lampiran.pdf Restricted to Repository staff only Download (3MB) |
Abstract
As the first health service center in Ogan Ilir Regency, the need for water at the Ogan Ilir Regency Regional General Hospital is one of the important needs used by patients, employees, hospital visitors, and other daily needs. The data needed in this study consists of two types, namely primary data collection, namely interviews and field observations. Secondary data was obtained from the number and composition of hospital beds, data on the number of residents of home hospitals and data on the number of toilets in the Ogan Ilir Regency Regional General Hospital. The total daily maximum water demand is 116,000 liters/day or 116 m³/day, while the total amount of clean water available for operations at the Ogan Ilir Regency Regional General Hospital is 74,000 liters or 74 m³/hari. The availability of clean water for operations at the Ogan Ilir Regency Regional General Hospital is only able to meet water needs of 64.79%, which means that it is not enough to meet the needs of clean water by 36.21%. To meet the needs of clean water, it is recommended to add a top resevoir in the form of a Roof Tank so that if at any time the water from the PDAM does not turn on, it can still be helped by water from the Roof Tank and the addition of supply discharge from the PDAM to the Ogan Ilir Regency Regional General Hospital. Keywords: Water needs, Clean water, Hospitals
Item Type: | Thesis (Skripsi) |
---|---|
Additional Information: | Pembimbing : 1. Ir. Erny Agusri,M.T. 2. M. Hijrah Agung Sarwandy, S.T.,M.T. |
Uncontrolled Keywords: | Keywords: Water needs, Clean water, Hospitals |
Subjects: | Teknik Sipil > Teknik Hidraulis |
Divisions: | Fakultas Teknik > Teknik Sipil (S1) |
Depositing User: | Mahasiswa Fakultas Teknik |
Date Deposited: | 05 May 2025 04:29 |
Last Modified: | 05 May 2025 04:29 |
URI: | http://repository.um-palembang.ac.id/id/eprint/30370 |
Actions (login required)
![]() |
View Item |