WIKI ROHMAN PRADIKA, NIM. 112019123 (2024) ANALISA KERUSAKAN RUAS JALAN TRANS BATUMARTA V SAMPAI DENGAN BATUMARTA VI KABUPATEN OGAN KOMERING ULU TIMUR (STA 0+000 – 5+000). Skripsi thesis, Universitas Muhammadiyah Palembang.
|
Text
112019123_BAB I_DAFTAR PUSTAKA....pdf Download (1MB) | Preview |
|
Text
112019123_BAB II.pdf - Published Version Restricted to Repository staff only Download (1MB) |
||
Text
112019123_BAB III.pdf - Published Version Restricted to Repository staff only Download (213kB) |
||
Text
112019123_BAB IV.pdf - Published Version Restricted to Repository staff only Download (372kB) |
||
Text
112019123_BAB V.pdf - Published Version Restricted to Repository staff only Download (113kB) |
||
Text
112019123_DAFTAR PUSTAKA.pdf - Published Version Restricted to Repository staff only Download (112kB) |
||
Text
112019123_LAMPIRAN.pdf - Published Version Restricted to Repository staff only Download (4MB) |
||
Text
112019123_COVER SAMPAI LAMPIRAN_Wiki.pdf - Published Version Restricted to Repository staff only Download (8MB) |
Abstract
Road is a land transportation infrastructure that is very important in facilitating economic relations and other social activities. However, if there is road damage, it will result not only in hindering other economic and social activities but there can be accidents for road users. This research was conducted on the 5-kilometer Trans Batumarta V – Batumarta VI Road, East Oku Regency. The purpose of this study is to determine the cause of road damage on the Trans Batumarta V - Batumarta VI road section. The purpose of this study is to determine the amount of LHR, identify the types of damage, calculate the percentage of damage and road capacity of the Trans Batumarta V - Batumarta VI road section, East Oku Regency. Based on the results of the study showed that damage to the Trans Batumarta V - Batumarta VI road section totaled 11,91% of the damage caused by vehicles with loads that exceeded the maximum road limit (overload), there was no drainage along the road which resulted in rainwater pooling and affecting the road pavement. Keywords : Road Damage, Pavement
Item Type: | Thesis (Skripsi) |
---|---|
Additional Information: | Pembimbing: 1. Ir. Lukman Muizzi, M.T 2. M. Hijrah Agung Sarwandy, S.T., M.T. |
Uncontrolled Keywords: | Keywords : Road Damage, Pavement |
Subjects: | Teknik Sipil > teknik jalan raya |
Divisions: | Fakultas Teknik > Teknik Sipil (S1) |
Depositing User: | Mahasiswa Fakultas Teknik |
Date Deposited: | 06 Mar 2024 07:05 |
Last Modified: | 06 Mar 2024 07:05 |
URI: | http://repository.um-palembang.ac.id/id/eprint/28352 |
Actions (login required)
View Item |