RENDI WIDODO, NIM. 112018233 (2022) PERBAIKAN JALAN ALTERNATIF LINTAS TENGAH SUMATERA : JL. LUBUK BERINGIN KABUPATEN LAHAT SEPANJANG 10 KM. Skripsi thesis, Universitas Muhammadiyah Palembang.
Text
112018233_BAB I_DAFTAR PUSTAKA.pdf - Published Version Restricted to Repository staff only Download (2MB) |
|
Text
112018233_BAB II.pdf - Published Version Restricted to Repository staff only Download (508kB) |
|
Text
112018233_BAB III.pdf - Published Version Restricted to Repository staff only Download (1MB) |
|
Text
112018233_BAB IV.pdf - Published Version Restricted to Repository staff only Download (1MB) |
|
Text
112018233_BAB V.pdf - Published Version Restricted to Repository staff only Download (72kB) |
|
Text
112018233_DAFTAR PUSTAKA.pdf - Published Version Restricted to Repository staff only Download (29kB) |
|
Text
112018233_LAMPIRAN.pdf - Published Version Restricted to Repository staff only Download (1MB) |
|
Text
112018233_Cover_sampai_Lampiran.pdf - Published Version Restricted to Repository staff only Download (5MB) |
Abstract
Roads are one of the infrastructures that support acceleration and the economy and play a very important role in the progress and development of a region. As a developing country, Indonesia is in dire need of good quantity and quality of roads in order to meet the needs of the community to carry out various types of daily economic activities. This research method uses the Bina Marga method where to analyze road damage, this method is one of the existing methods in Indonesia which has the final result, namely the order of priority and the form of the maintenance program according to the value obtained from the visual survey, namely the type of damage and the LHR (Traffic Trafficking) survey. Average Daily) which is then obtained the value of road conditions. The results of the study were found on the alternative middle cross road: jl lubuk beringin city Lahat the overall damage was 5,765 m² where the most dominant damage was curly damage with a total area of 1,953.3 m² having a percentage of 33.88% and damage analysis according to the bina marga method showed the order priority 9.06 is the order of priority >7. So that the appropriate type of handling on the alternative middle cross road: Jl Lubuk Beringin Kota Lahat is a routine maintenance program.
Item Type: | Thesis (Skripsi) |
---|---|
Additional Information: | Pembimbing 1: Ir. H. Jonizar, M.T 2. Ir. Erny Agusri, M.T |
Uncontrolled Keywords: | Keywords: Road Damage, Bina Marga, Lahat City. |
Subjects: | Teknik Sipil > teknik jalan raya |
Divisions: | Fakultas Teknik > Teknik Sipil (S1) |
Depositing User: | Mahasiswa Fakultas Teknik |
Date Deposited: | 31 Oct 2022 07:40 |
Last Modified: | 31 Oct 2022 07:40 |
URI: | http://repository.um-palembang.ac.id/id/eprint/23300 |
Actions (login required)
View Item |