ANALISA KEBUTUHAN AIR BERSIH DOMESTIK DI LIMA DESA KECAMATAN BANYUASIN III

MICO ZEPRY, NIM.112017040 (2022) ANALISA KEBUTUHAN AIR BERSIH DOMESTIK DI LIMA DESA KECAMATAN BANYUASIN III. Skripsi thesis, UNIVERSITAS MUHAMMADIYAH PALEMBANG.

[img]
Preview
Text
112017040_BAB I_DAFTAR PUSTAKA.pdf

Download (1MB) | Preview
[img] Text
112017040_BAB II.pdf
Restricted to Repository staff only

Download (599kB)
[img] Text
112017040_BAB III.pdf
Restricted to Repository staff only

Download (406kB)
[img] Text
112017040_BAB IV.pdf
Restricted to Repository staff only

Download (483kB)
[img] Text
112017040_BAB V.pdf
Restricted to Repository staff only

Download (283kB)
[img] Text
112017040_DAFTAR PUSTAKA.pdf
Restricted to Repository staff only

Download (289kB)
[img] Text
112017040_LAMPIRAN.pdf
Restricted to Repository staff only

Download (4MB)
[img] Text
112017040_Cover_sampai_Lampiran.pdf
Restricted to Repository staff only

Download (6MB)

Abstract

Water is one of the basic needs in survival for humans and it is certain that life will not exist without water. The existence of water on earth is used for various sectors. One form of utilization is to meet the needs of clean water and drinking water for humans. The types of clean water needs can be in the form of domestic water needs or household water needs, non-domestic needs, public services, and industry. Location This research was conducted in five villages in Banyuasin III sub-district, namely Session Mas, Rimba Alai, Ujung Tanjung, Pelajau Ilir, Tanjung Beringin. In this study, the authors look for solutions to clean water needs in the five villages of the Banyuasin III sub-district. From the results of the study, to meet the needs of clean water in five villages in the Banyuasin III sub-district, namely the Village of Session Mas - Rimba Alai - Ujung Tanjung, it is necessary to add 2 hours of water production service hours, which was originally 3 hours of water production service hours to 5 hours. Tanjung Beringin Village – Pelajau Ilir needs to add 30 minutes of water production service hours, which was originally 2 hours of water production service hours to 2.5 hours. Keywords: Need for clean water, population

Item Type: Thesis (Skripsi)
Additional Information: Pembimbing : 1. Ir.A.Junaidi,M.T 2. Ir.Hj.Nurnilam Oemiati,M.T
Uncontrolled Keywords: Keywords: Need for clean water, population
Subjects: Teknik Sipil > Teknik Hidraulis
Divisions: Fakultas Teknik > Teknik Sipil (S1)
Depositing User: Mahasiswa Fakultas Teknik
Date Deposited: 17 Oct 2022 02:43
Last Modified: 17 Oct 2022 02:43
URI: http://repository.um-palembang.ac.id/id/eprint/23014

Actions (login required)

View Item View Item

is powered by EPrints 3 which is developed by the School of Electronics and Computer Science at the University of Southampton. More information and software credits.