THORIQ KHAVID, NIM.112017173 (2022) ANALISA DAYA DUKUNG PONDASI TIANG PANCANG KELOMPOK JEMBATAN KERAMASAN LAMA PROYEK KPBU PRESERVASI JALAN LINTAS TIMUR SUMATERA. ANALISA DAYA DUKUNG PONDASI TIANG PANCANG KELOMPOK JEMBATAN KERAMASAN LAMA PROYEK KPBU PRESERVASI JALAN LINTAS TIMUR SUMATERA. (Unpublished)
|
Text
112017173_COVER_BAB I_ DAFTAR PUSTAKA.pdf - Published Version Download (1MB) | Preview |
|
Text
112017173_BAB II.pdf - Published Version Restricted to Repository staff only Download (449kB) | Request a copy |
||
Text
112017173_BAB III.pdf - Published Version Restricted to Repository staff only Download (1MB) | Request a copy |
||
Text
112017173_BAB IV.pdf - Published Version Restricted to Repository staff only Download (306kB) | Request a copy |
||
Text
112017173_BAB V.pdf - Published Version Restricted to Repository staff only Download (158kB) | Request a copy |
||
Text
112017173_DAFTAR PUSTAKA.pdf - Published Version Restricted to Repository staff only Download (16kB) | Request a copy |
||
Text
112017173_LAMPIRAN.pdf - Published Version Restricted to Repository staff only Download (2MB) | Request a copy |
||
Text
SKRIPSI FULL THORIQ KHAVID_112017173.pdf - Published Version Restricted to Repository staff only Download (3MB) | Request a copy |
Abstract
ABSTRACT The use of piles is a very calculated choice in construction, judging from what construction will be built, the soil conditions at the site, and the efficiency of equipment mobilization are one of the reasons why this type is used. The foundation is the lowest part of the building (substructure) and is located in the ground, which serves to support the loads of the building working on it, and its own weight to the supporting soil layers (bearing layers). Determining the efficiency of the variations that the researchers made in this study, or which can be an option/replacement for the group foundation on the Old Keramasan Bridge project. This East Sumatran Cross Road Preservation Activity is a variation that has a carrying capacity value greater than the existing carrying capacity (diameter 50 cm). ). The method used in this study is the manual calculation using the Vesic method (1977) and the Vesic method with allpile software. The results of this study are the carrying capacity of the group pile foundation at P01 empirically Vesic is 4091.57 kN and Vesic software allpile is 4048.69 kN and after that it is varied with different pile sizes using allpile software, the most efficient value is obtained when it is used to replace group foundations. is a variation of 400 mm in diameter with a depth of 25 meters with as many as 4 pillars with a volume of 13,062 m³ with a difference of 27.6% with the volume of the existing pile.
Item Type: | Article |
---|---|
Additional Information: | 1. MUHAMMAD ARFAN S.T.,M.T. 2. Ir.HJ.RA. SRI MARTINI,M.T |
Uncontrolled Keywords: | Key words : Pile foundation of the old Keramasan Bridge Group at point P01 upstream of the East Sumatra Causeway Preservation Activity, Vesic Method (1977), allpile software. |
Subjects: | Teknik Sipil > Teknik Fondasi |
Divisions: | Fakultas Teknik > Teknik Sipil (S1) |
Depositing User: | Mahasiswa Fakultas Teknik |
Date Deposited: | 10 Oct 2022 05:29 |
Last Modified: | 10 Oct 2022 05:29 |
URI: | http://repository.um-palembang.ac.id/id/eprint/22915 |
Actions (login required)
View Item |