DIMAS ALFARIZI, 112018098 (2022) ANALISA KEBUTUHAN AIR BERSIH DI KELURAHAN PAGAR TENGAH KECAMATAN PENDOPO KABUPATEN EAMPAT LAWANG. Skripsi thesis, Universitas Muhammadiyah Palembang.
|
Text
112018098_BAB I_DAFTAR PUSTAKA.PDF.pdf Download (924kB) | Preview |
|
Text
112018098_BAB II.PDF.pdf Restricted to Repository staff only Download (526kB) |
||
Text
112018098_BAB III.PDF.pdf Restricted to Repository staff only Download (474kB) |
||
Text
112018098_BAB IV.PDF.pdf Restricted to Repository staff only Download (592kB) |
||
Text
112018098_BAB V.PDF.pdf Restricted to Repository staff only Download (398kB) |
||
Text
112018098_DAFTAR PUSTAKA.PDF.pdf Restricted to Repository staff only Download (292kB) |
||
Text
112018098_LAMPIRAN.pdf Restricted to Repository staff only Download (1MB) |
||
Text
112018098_Cover_sampai_Lampiran...pdf Restricted to Repository staff only Download (3MB) |
Abstract
The people of Pagar Tengah Village rely on water from PDAM Tirta Seguring Betung IPA Pendopo to carry out their daily activities. However, in fact, the need for clean water in Pagar Tengah Village, which is supplied from PDAM, is still not fulfilled. Therefore, this study aims to determine the capacity of clean water needs in the area with existing secondary data and compare them to this final project. The method used to estimate water production is based on the method of the Directorate General of Human Settlements, Ministry of Public Works, 1998, which is about the pattern of fluctuations in the demand for clean water at peak hours. To calculate this research, the data used in the form of a flow rate of 20 liters/second and operating hours for 4 hours/day obtained from the local PDAM. From the results of water calculations in Pagar Tengah Village, there is a water shortage of -73.24 M3/day. To meet the air demand in Pagar Tengah Village, by conducting a simulation in the form of adding 3 hours of water production so that the initial water production is 4 hours to 7 hours, or by adding the flow rate of production from 20 liters/second to 22 liters/second, or adding production hours from 2 hours to 6 hours and the flow rate of production from 20 liters/second was increased to 25 liters/second. Keywords: Pagar Tengah Village, Clean Water Needs, Analysis.
Item Type: | Thesis (Skripsi) |
---|---|
Additional Information: | PEMBIMBING : 1. Ir. Erny Agusri, M.T 2. Ir. Nurnilam Oemiati, M.T |
Uncontrolled Keywords: | Pagar Tengah Village, Clean Water Needs, Analysis. |
Subjects: | Teknik Sipil > Teknik Hidraulis |
Divisions: | Fakultas Teknik > Teknik Sipil (S1) |
Depositing User: | Mahasiswa Fakultas Teknik |
Date Deposited: | 07 Oct 2022 02:15 |
Last Modified: | 07 Oct 2022 02:15 |
URI: | http://repository.um-palembang.ac.id/id/eprint/22902 |
Actions (login required)
View Item |