ANALISA PERBANDINGAN EFISIENSI PENGGUNAAN MTT DAN HTT PADA PEKERJAAN PENINGKATAN JALUR KERETA API SEGMEN TEBING TINGGI - MUARA SALING.

VETRISYA NITA RIZA YUSMA, NIM. 112018094 (2022) ANALISA PERBANDINGAN EFISIENSI PENGGUNAAN MTT DAN HTT PADA PEKERJAAN PENINGKATAN JALUR KERETA API SEGMEN TEBING TINGGI - MUARA SALING. Skripsi thesis, Universitas Muhammadiyah Palembang.

[img]
Preview
Text
112018094_BAB I_DAFTAR PUSTAKA.pdf

Download (1MB) | Preview
[img] Text
112018094_BAB II.pdf
Restricted to Repository staff only

Download (722kB)
[img] Text
112018094_BAB III.pdf
Restricted to Repository staff only

Download (536kB)
[img] Text
112018094_BAB IV.pdf
Restricted to Repository staff only

Download (549kB)
[img] Text
112018094_BAB V.pdf
Restricted to Repository staff only

Download (318kB)
[img] Text
112018094_DAFTAR PUSTAKA.pdf
Restricted to Repository staff only

Download (315kB)
[img] Text
11208094_LAMPIRAN.pdf
Restricted to Repository staff only

Download (986kB)
[img] Text
112018094_Cover_sampai_Lampiran....pdf
Restricted to Repository staff only

Download (4MB)

Abstract

Track Laying R42 to R54 Project is the project that has been done in Tebing Tinggi sub-districts, Empat Lawang regency that starts from Tebing Tinggi Station until Muara Saling Station with employment volume 19.637 M’Sp. This project was meant for increasing the quality of the railways that can make the train go faster than before. The finishing of this project, there is ballast compression using MTT mechine. Besides using MTT, there is ballast compression that using HTT. MTT and HTT is a different mechine even they both have the same function. Based on the datas analysis and calculation from the study, MTT is 94% more efficient than HTT in mechine production. But for the cost, HTT is 64% mor efficient than MTT.

Item Type: Thesis (Skripsi)
Additional Information: Pembimbing : 1. Ir. RA. Sri Martini, M.T 2. Ir. Revisdah, M.T
Uncontrolled Keywords: Track Laying, Mechine Production, Cost, MTT, HTT.
Subjects: Teknik Sipil > teknik jalan kereta api
Divisions: Fakultas Teknik > Teknik Sipil (S1)
Depositing User: Mahasiswa Fakultas Teknik
Date Deposited: 28 Mar 2022 02:00
Last Modified: 28 Mar 2022 02:00
URI: http://repository.um-palembang.ac.id/id/eprint/19770

Actions (login required)

View Item View Item

is powered by EPrints 3 which is developed by the School of Electronics and Computer Science at the University of Southampton. More information and software credits.