M RIDHO KURNIAWAN, NIM. 112017170 (2021) ANALISA KAPASITAS BOOSTER UNTUK MEMENUHI KEBUTUHAN AIR BERSIH DI KECAMATAN INDRALAYA SELATAN KABUPATEN OGAN ILIR. Skripsi thesis, Universitas Muhammadiyah Palembang.
|
Text
112017170_BAB I_DAFTAR PUSTAKA...pdf Download (2MB) | Preview |
|
Text
112017170_BAB II.pdf Restricted to Repository staff only Download (913kB) |
||
Text
112017170_BAB III.pdf Restricted to Repository staff only Download (705kB) |
||
Text
112017170_BAB IV.pdf Restricted to Repository staff only Download (1MB) |
||
Text
112017170_BAB V.pdf Restricted to Repository staff only Download (117kB) |
||
Text
11201717-_DAFTAR PUSTAKA.pdf Restricted to Repository staff only Download (254kB) |
||
Text
112017170_COVER_SAMPAI_LAMPIRAN.pdf Restricted to Repository staff only Download (3MB) |
Abstract
Abstract People who live in the South Indralaya District, namely Meranjat 1, Meranjat 2, Meranjat 3, Meranjat Ilir, Muara Meranjat, and Beti villages, mostly consume clean water managed by the Regional Drinking Water Company (PDAM) Tirta Ogan Booster Ogan Ilir. The imbalance between the amount of clean water and the number of customers can result in a lack of clean water supply for each customer. Therefore, the authors are interested in conducting research with the title "Analysis of Booster Capacity to Meet the Needs of Clean Water Customers in the Community in South Indralaya District, Ogan Ilir Regency in 2021-2025". Clean water is one of the basic needs in supporting human life. The imbalance between the amount of clean water and the number of customers can result in a lack of clean water supply for each customer. This research is a case study by analyzing the data. In data processing using geometric, arithmetic and exponential methods. The data used are data on the number of customers for the last 5 years, namely 2025-2019 and data on the water discharge capacity of PDAM Booster Ogan Ilir. The research stages include projected growth in the number of customers and analysis of clean water needs from 2021 to 2025. Based on the results of the analysis, the projected number of customer growth in 2021-2025 is 12345 to 14443 customers. Meanwhile, the need for clean water in 2021-2025 is 84 to 104.4 liters/second. Thus, it can be concluded that PDAM Booster Ogan Ilir is not able to meet the needs of clean water starting in 2025 because the discharge of clean water needs is greater at 104.4 liters/second than the available capacity discharge, which is 100 liters/second. Key Words :People in Indralaya Selatan Subdistrict, Raw Water, Analysis
Item Type: | Thesis (Skripsi) |
---|---|
Additional Information: | Pembimbing : 1. Ir.Hj.RA Sri Martini, M.T 2. Ir. Lukman Muizzi,M.T |
Uncontrolled Keywords: | People in Indralaya Selatan Subdistrict, Raw Water, Analysis |
Subjects: | Teknik Sipil > Teknik Hidraulis |
Divisions: | Fakultas Teknik > Teknik Sipil (S1) |
Depositing User: | Mahasiswa Fakultas Teknik |
Date Deposited: | 26 Feb 2022 06:18 |
Last Modified: | 26 Feb 2022 06:18 |
URI: | http://repository.um-palembang.ac.id/id/eprint/19342 |
Actions (login required)
View Item |