ANALISA KERUSAKAN RUAS JALAN TRANS BATUMARTA V SAMPAI DENGAN BATUMARTA VI KABUPATEN OGAN KOMERING ULU TIMUR (STA 0+000 – 5+000)
WIKI ROHMAN PRADIKA, NIM. 112019123 (2024) ANALISA KERUSAKAN RUAS JALAN TRANS BATUMARTA V SAMPAI DENGAN BATUMARTA VI KABUPATEN OGAN KOMERING ULU TIMUR (STA 0+000 – 5+000). Skripsi thesis, Universitas Muhammadiyah Palembang.
Preview
112019123_BAB I_DAFTAR PUSTAKA....pdf
Download (1MB) | Preview
112019123_BAB II.pdf - Published Version
Restricted to Repository staff only
Download (1MB)
112019123_BAB III.pdf - Published Version
Restricted to Repository staff only
Download (213kB)
112019123_BAB IV.pdf - Published Version
Restricted to Repository staff only
Download (372kB)
112019123_BAB V.pdf - Published Version
Restricted to Repository staff only
Download (113kB)
112019123_DAFTAR PUSTAKA.pdf - Published Version
Restricted to Repository staff only
Download (112kB)
112019123_LAMPIRAN.pdf - Published Version
Restricted to Repository staff only
Download (4MB)
112019123_COVER SAMPAI LAMPIRAN_Wiki.pdf - Published Version
Restricted to Repository staff only
Download (8MB)
Abstract
Road is a land transportation infrastructure that is very important in
facilitating economic relations and other social activities. However, if there is road
damage, it will result not only in hindering other economic and social activities but
there can be accidents for road users.
This research was conducted on the 5-kilometer Trans Batumarta V –
Batumarta VI Road, East Oku Regency. The purpose of this study is to determine
the cause of road damage on the Trans Batumarta V - Batumarta VI road section.
The purpose of this study is to determine the amount of LHR, identify the types of
damage, calculate the percentage of damage and road capacity of the Trans
Batumarta V - Batumarta VI road section, East Oku Regency.
Based on the results of the study showed that damage to the Trans
Batumarta V - Batumarta VI road section totaled 11,91% of the damage caused by
vehicles with loads that exceeded the maximum road limit (overload), there was no
drainage along the road which resulted in rainwater pooling and affecting the road
pavement.
Keywords : Road Damage, Pavement
| Item Type: | Thesis (Skripsi) |
|---|---|
| Additional Information: | Pembimbing: 1. Ir. Lukman Muizzi, M.T 2. M. Hijrah Agung Sarwandy, S.T., M.T. |
| Uncontrolled Keywords: | Keywords : Road Damage, Pavement |
| Subjects: | Teknik Sipil > teknik jalan raya |
| Divisions: | Fakultas Teknik > Teknik Sipil (S1) |
| Depositing User: | Mahasiswa Fakultas Teknik |
| Date Deposited: | 06 Mar 2024 07:05 |
| Last Modified: | 06 Mar 2024 07:05 |
| URI: | https://repository.um-palembang.ac.id/id/eprint/28352 |
