FERDI MUTTAQIN, NIM. 112022059 (2026) PENERAPAN SISTEM MANAJEMEN KESELAMATAN DAN KESEHATAN KERJA (SMK3) PROYEK PEMBANGUNAN GEDUNG ONCOLOGY CENTER RUMAH SAKIT MOHAMMAD HOESIN PALEMBANG. Skripsi thesis, Universitas Muhammadiyah Palembang.
|
Text
112022059_BAB 1_ DAFTAR PUSTAKA.pdf - Published Version Download (3MB) | Preview |
|
|
Text
112022059_BAB II.pdf Restricted to Repository staff only Download (1MB) |
||
|
Text
112022059_BAB III.pdf Restricted to Repository staff only Download (545kB) |
||
|
Text
112022059_BAB IV.pdf Restricted to Repository staff only Download (831kB) |
||
|
Text
112022059_BAB V.pdf Restricted to Repository staff only Download (358kB) |
||
|
Text
112022059_DAFTAR PUSTAKA.pdf Restricted to Repository staff only Download (284kB) |
||
|
Text
112022059_LAMPIRAN.pdf Restricted to Repository staff only Download (4MB) |
||
|
Text
112022059_COVER_SAMPAI_LAMPIRAN.pdf Restricted to Repository staff only Download (11MB) |
Abstract
Ferdi Muttaqin1, Revisdah2, Verinazul Septriansyah3 Occupational Health and Safety (OHS) is a crucial factor in the success of construction projects to minimize the risk of accidents and losses. This study aims to determine the implementation level of the Occupational Health and Safety Management System (SMK3) as a fulfillment of corporate safety culture at the Oncology Center Building Construction Project of Mohammad Hoesin Hospital (RSMH) Palembang. The research method used is descriptive quantitative, with data collection through observation and questionnaires distributed to 40 project workers as respondents. The sample size was determined using the Slovin formula with a precision level of 15%. Data analysis was conducted to measure compliance based on SMK3 indicators according to Government Regulation No. 50 of 2012, covering aspects of policy, planning, implementation, monitoring, and management review. The results showed that the implementation of SMK3 in this project is in accordance with the provisions of Government Regulation No. 50 of 2012. Based on the scoring results, the SMK3 implementation level is in the "Satisfactory" category with a final score of 88.67%. This achievement is supported by high average scores for each indicator: OHS Management Policy (89.37%), Planning (86.75%), Implementation and Preparedness (88.18%), Monitoring and Evaluation (88.3%), and Management Review (90.75%). This indicates that the safety standard implementation in the field has been carried out well in accordance with applicable standards.Keywords : Construction, OHS, SMK3, Mohammad Hoesin Hospital, Government Regulation No. 50 of 2012
| Item Type: | Thesis (Skripsi) |
|---|---|
| Additional Information: | Pembimbing 1 : Ir. Revisdah, M.T. Pembimbing 2 : Dr. Verinazul Septriansyah, S.T., M.T. |
| Uncontrolled Keywords: | Construction, OHS, SMK3, Mohammad Hoesin Hospital, Government Regulation No. 50 of 2012 |
| Subjects: | Teknik Sipil > Teknik Struktural |
| Divisions: | Fakultas Teknik > Teknik Sipil (S1) |
| Depositing User: | Mahasiswa Fakultas Teknik |
| Date Deposited: | 07 May 2026 03:01 |
| Last Modified: | 07 May 2026 03:01 |
| URI: | http://repository.um-palembang.ac.id/id/eprint/35794 |
Actions (login required)
![]() |
View Item |
